Hot Tub Maintenance Checklist with Dazzle specialty hot tub products

Hot Tub Maintenance Checklist:

Start-Up

While hot tub is filling, add initial dose (375 ml per 1,000 L) of Dazzle Stain & Scale 1 to cold water. Once full, start pump, operate with the aeration off and commence heating.


Use test strips to calculate your alkalinity, PH, calcium and bromine or chlorine readings. Make adjustments to alkalinity first, the either PH+/-, then calcium. Lastly make sure your floater has sanitizer. You can add bromine or chlorine granules (which ever you use) to top up sanitizer levels right away.

Allow water to circulate for 2 hours.

Apply Dazzle Amaze per label directions (2 caps per 1,000 L). Ensure that the pump and filter are operating and leave the cover off for a minimum of one hour after application. Allow water to circulate for at least 15 minutes before proceeding to next step.

Add initial dose of Dazzle Botanical Cleanse (3 caps per 1,000 L). Pour around the edges of the hot tub with the pump operating and the aeration off. Avoid adding Dazzle Botanical Cleanse when the sanitizer level is above 5 ppm.


Apply chlorine or bromine to the hot tub. Use Dazzle Bromine Granules or Chlorine Granules to initially establish the residual. Fill your tablet dispenser with enough Dazzle Bromine Tablets or Mini Chlorinating Tablets to maintain
a continuous level of 3.0 – 5.0 ppm through the week.


Add initial dosage of Dazzle Performance Plus (200 g per 1,000 L). Apply through the skimmer or in front of the suction plate with the pump in operation and the aeration off.


Add initial dosage of Dazzle Nature Sheen (20 ml per 1,000 L.). Apply with the pump in operation and the aeration off. Run filter continuously until water clears. Dazzle Nature Sheen will agglomerate particulate into masses large enough to be filtered out. Watch filter closely and clean as required.

As Required
Test sanitizer and pH level with test strips. Add Dazzle Bromine Granules or Chlorine Granules to boost the sanitizer level should it fall below 3.0 ppm. Always maintain the bromine/chlorine reading between
3.0 – 5.0 ppm. The pH level should be maintained at 7.4 - 7.6.

Leave a comment

Name .
.
Message .

Please note, comments must be approved before they are published